Pre-purchase & mortgage inspections · Durham

Structural engineer’s report before you buy

Your surveyor has flagged cracks or movement, or your lender wants a structural engineer’s report before it will release the mortgage. We visit, find the likely cause and give you a clear written report, so you can decide whether to go ahead.

From £650+VAT, fixed and confirmed in writing before we visit. Visit usually within a week, report usually within a week of the visit.

Tell us your exchange or mortgage deadline when you book, and we’ll tell you straight away whether we can meet it.

When you need one

  • Your RICS Level 2 or Level 3 survey recommends “further investigation by a structural engineer”.
  • Your mortgage valuer or lender has asked for a structural engineer’s report, or has held back part of the loan (a retention) until one is provided.
  • The house has cracks, a bowing or leaning wall, sloping floors or a moving bay window, and you want to know what you’re buying.
  • The house is in a former coal mining area and you want the condition checked.
  • You’re selling, and your buyer’s surveyor has raised a structural concern. A report can answer it before the sale stalls.

What you get

  • A visit by a structural engineer, who looks at the concern and the parts of the house around it.
  • A written report in plain English, with annotated photos.
  • The damage category, using the BRE scale that lenders and insurers recognise.
  • The likely cause, and whether the movement looks historic or possibly ongoing.
  • Clear recommendations: no action needed, simple repairs, or further investigation, in order of what to do first.
  • A report you can pass to your lender, solicitor or surveyor.

What it costs

StageFee
Inspection and written reportFrom £650+VAT
Further investigation, if needed (for example a trial pit)From £280+VAT

Your fee is fixed and confirmed in writing before we visit. If there is more than one area of concern, we’ll confirm the fee before booking. Drainage surveys are carried out separately by a specialist contractor.

Timescales and your deadline

Visits are usually within a week of booking, and the report usually follows within a week of the visit.

If movement may still be happening, we’ll say so plainly. Sometimes the only way to be sure is to monitor the cracks over several months. If that applies, we’ll explain what it means for your purchase and the options, so you and your solicitor can decide how to proceed.

How it works

1

Book online

Tell us about the property, the concern and your deadline. Attach the surveyor’s report or photos if you have them.

2

We confirm the fee and visit date

In writing.

3

An engineer visits

And inspects the area of concern.

4

You receive the report

With the cause, damage category and recommendations.

Example

Repaired cracks that had reopened

Pre-purchase · house, Durham
The concern
A buyer noticed repaired cracking around the rear patio doors and first-floor windows, some of which had reopened. They needed to know whether it was serious before committing to the purchase.
What we found
Our first visit set out what could and couldn't be judged by eye. A trial pit then exposed a crack of about 15mm in the masonry below the patio doors, closing before it reached the foundation, with no visible cracking in the exposed footing.
Outcome
Significant local movement of the masonry, but no evidence of foundation failure or active subsidence. We recommended targeted checks and a year of crack monitoring before any permanent repair, rather than jumping to underpinning.
Trial pit exposing brickwork and the concrete foundation, with a vertical crack in the brickwork closing above the foundation
Trial pit: the crack closes two or three courses above the foundation.
Close-up of an open vertical crack through bricks and mortar below a door sill
About 15mm wide directly below the door sill.
Rear elevation of a brick house with patio doors and the excavated patio in front
Rear elevation, with previously repaired cracking above the patio doors.
★★★★★

Used CR Design Services for calculations and drawings for an extension/new build. We found the company through a web-search. Amazing response and turnaround times and Chris was always happy to help if we needed changes to the design. High quality service and excellent value. Highly recommend and would definitely use again.

Lewis HowlettGoogle review
★★★★★

Caroline & Christopher of CR Design Services were great to work with. They were both very supportive, efficient and very knowledgeable. I would have no hesitation in recommending them and working with them in the future. Thanks.

Gilbert MuirheadGoogle review
★★★★★

Chris has provided us with a fantastic service. Great job and communication throughout. Very prompt service, highly recommended.

Mike FreemanGoogle review

Where we cover

County Durham, Newcastle and Tyneside, Sunderland and Wearside, Darlington and Teesside. For anywhere else, email sales@crdesignservices.co.uk and we’ll tell you honestly whether we can help.

Common questions

Is this the same as a RICS survey?

No. A RICS Level 2 or Level 3 survey covers the whole property. When a surveyor sees signs of structural movement, they usually recommend a structural engineer looks at it in more detail. That is what this inspection is.

Can you meet my exchange date?

Tell us the date when you book. We’ll confirm straight away whether we can meet it before you commit.

I’m the seller. Can I book this?

Yes. Sellers often commission a report to answer a buyer’s surveyor and keep the sale moving.

Do I need to be there?

No. Someone needs to give us access, usually the seller or the estate agent. We’ll arrange it with whoever you tell us.

What if the report says there’s a problem?

The report sets out what needs doing and in what order. If repairs need designing, we can do that too, so you can get builders’ quotes before you commit or renegotiate the price.

Does the report cover the whole house?

No. It covers the concern raised and the parts of the house around it. It is visual and non-intrusive. Where the cause can’t be confirmed without further investigation, the report says so and recommends the next step.

Buying a house with a structural question mark?

Book now, tell us your deadline and we’ll confirm the fee and visit date in writing.

We usually reply the same working day. Mon to Fri, 9am to 4.30pm.