We can prepare everything you need to submit to building control
Building control (also known as building regulations) refers to the minimum standards for how a building is constructed. Whilst it is different to planning permission, you may require both for your project.
Preparing your building control application
Once planning permission has been granted, your CR Design project team can finalise the technical specifications of your project by preparing technical drawings and construction details for your application.
Ready to submit within weeks
Your team of experienced architects and structural engineers will have your building control application ready in 2-3 weeks.
We will then submit it to your local council building control team on your behalf, acting as your agent for the duration of the project.
Incorporating building plans
To prepare your building control drawings and technical specifications we will use planning drawings produced in the previous stage of your project.
We can use drawings produced as part of our concept design & planning package, or drawings that have been produced by third-party architects.
Drawings for your building control application
The technical drawings and construction details will cover every aspect of the project, including the foundations, roof, walls and thermal insulation.
Structural design and calculations
It is likely that you will be required to submit a structural design report (also known as structural calculations) as part of your building control application.
CR Designs can prepare the structural design report and submit it to the local council building control team as part of the application.
Alternatively, we can include a report prepared by a third-party structural engineer.
Read more about our structural design & calculation packages.
Submitting the report to your local council building control team
We will submit your building control application to the council once the drawings and technical specifications have been agreed.
Not only will we submit the application to the council, or to a private building control inspector of your choice, we will also act as your agent for the duration of the application.
Please note: building control application fees are not included in our packages.
CR Designs building control packages
Our comprehensive and affordable packages include the following services:
All technical drawings and written specifications required for the building control application.
Building control application prepared and submitted to your local council, or to a private building control inspector of your choice (Note: building control application fees are not included).
CR Designs to act as your agent and provide support for the duration of the project.
Full package ready to submit within 2-3 weeks.
Your project team will also respond to any technical questions from you, your builder or the council via email, phone, or video call.
CR Design packages are suitable for all types of house extension, renovation and self-build projects.
What's next?
For the duration of the project, we will respond to any technical questions from you, your builder or the council via email, phone, or video call.
Let CR Design take your project to the next stage.
Contact us today for further information and to request a quotation.
Spotlight on:
Garage conversions
Converting an existing garage into an office or bedroom usually would not require a planning application, but would require a building control application.
Our other services
Planning Permission Drawings
Our team of architects and designers will guide your project from concept design through to planning application.
Structural Engineering Services
Most projects will require a structural design report as part of the building control application.
Measured Building
Surveys
A measured survey includes key information to complete planning drawings including measurements, sketches and photos.
Enquiry form
Building regulation drawings enquiry
Use the form below to send us details of your project
"*" indicates required fields